interview with President

SPK GROUP is striving to become one of the leading Russian companies in the international O&G and energy construction market. Our company has been participating in major O&G projects in Turkey, Bulgaria and Serbia since 2017 that gives us a reason for ambitious plans.

We expect to become a fully functioning EPC contractor in the mid-term period. For this reason in 2019 we established: SPK Engineering design institute, SPK-Energy subsidiary in Serbia and SPK-West subsidiary which succeeds in implementing projects in Bulgaria within the EU.

Our company is based on principles of freedom of business operations, fulfillment in good faith of obligations towards partners, accountability and competence. That is why our mission statement is: “RELIABILITY. QUALITY. RESULT”. These are the things our clients and partners expect and get from us.  

Nail Abdullin, SPK GROUP President

interview with President

Company mission

Mission of SPK-Magistral is to foster sustainable social and economic growth within its footprint both in Russia and abroad through continuous improvement of quality, reliability, durability and safety of constructed facilities. To ensure sustained and long-term business growth, implement state-of-the-art technologies, improve professional expertise, moral and consciousness of our employees, show concern for personnel safety and environment, ensure conservation of natural resources.

Company objective is to become one of the leading companies in the international arena, increase number of EPC contracts and enter the top 3 of international O&G construction companies headquartered in Russia having distinctive competence in complicated welding mechanical works. The key for SPK-Magistral to reach this objective is to focus on latest international standards and practices of project management, continuously improve and elaborate new approaches in doing fair and transparent business.

Corporate values

Reliability
We are a reliable partner for our customers and we always meet our commitments.

Quality
We are striving to become the best without compromising quality.

Result
We deliver result-oriented projects.

Safety and environmental sustainability
We are concerned about the safety of our employees and protection of the environment.

Business ethics
We abide by good business practices and promote fair treatment of our staff.
Corporate values

History

2022
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2004
2003

2022

Construction (retrofit) of CDU/VDU-6 Plant and FCC unit of the Complex of Oil Refinery and Petrochemical Plants in Nizhnekamsk.

2021

Construction (retrofit) of CDU/VDU-6 Plant and FCC unit of the Complex of Oil Refinery and Petrochemical Plants in Nizhnekamsk.

Infrastructure development of the Mining and Processing Plant for the Extraction and Enrichment of Potash Salts with a capacity of 2.3 MTA of 95% KLC of the Gremyachinskoe potash deposit.

2020

Construction (retrofit) of CDU/VDU-6 Plant and FCC unit of the Complex of Oil Refinery and Petrochemical Plants in Nizhnekamsk.

2019

Construction of onshore section of TurkStream Offshore Pipeline (Russia), construction of TurkStream Gas Pipeline Connection to the Receiving Terminal, (Turkey).

Establishment of subsidiaries SPK-Engineering, SPK-Technoconsult and SPK-West.

Construction (retrofit) of CDU/VDU-6 Plant and FCC unit of the Complex of Oil Refinery and Petrochemical Plants in Nizhnekamsk.

2018

Construction of onshore section of TurkStream Offshore Pipeline (Russia).

Construction of TurkStream Gas Pipeline Connection to the Receiving Terminal, (Turkey).

2017

Construction of onshore section of TurkStream Offshore Pipeline (Russia).

2016

Overhaul of gas pipeline of connecting flow-lines and process piping of stages 1 and 2 using re-coating method at BCS-2 of Stavropol Local Operations & Maintenance Department for Main Gas Pipelines.

2015

Overhaul of gas pipeline of connecting flow-lines and process piping of stages 1 and 2 using re-coating method at BCS-2 of Stavropol Local Operations & Maintenance Department for Main Gas Pipelines.

2014

Overhaul of input and output flow-lines, process piping of CS Oktyabrskaya.

Overhaul of gas pipeline of connecting flow-lines and process piping of stages 1 and 2 using re-coating method at BCS-2 of Stavropol Local Operations & Maintenance Department for Main Gas Pipelines.

Turn-key construction of gas distribution stations Kurskaya, Sengileevka.

Major construction of CS Izobilniy-Nevinnomyssk main gas pipeline ∅530, Start-up Complex II, at km 43.4 - km 0.

2013

Overhaul of input and output flow-lines, process piping of CS Oktyabrskaya.

Turn-key construction of gas distribution stations Peligiada and Sukhaya Bujvola, automated gas distribution station Barsukovskaya.

Overhaul with complete replacement of Ø530 CS Zhuravskaya-Kangly gas pipeline at 55-65 km.

Overhaul of gas pipeline of connecting flow-lines and process piping of stages 1 and 2 using re-coating method at BCS-2 of Stavropol Local Operations & Maintenance Department for Main Gas Pipelines.

2012

Overhaul with complete replacement of Ø820 mm AGPZ-Kamysh-Burun main gas pipeline at 320-349 km.

Turn-key construction of gas distribution station Kamennaya Balka.

Overhaul of input and output flow-lines, process piping of CS Oktyabrskaya.

2011

Overhaul of input and output flow-lines of CS Egorlykskaya.

Overhaul with complete replacement of Ø820 mm AGPZ-Kamysh-Burun main gas pipeline at 320-349 km.

2010

Overhaul of input and output flow-lines of CS Egorlykskaya.

Overhaul of underground process piping and connecting flow-lines of Compressor Station Zamyany.

Overhaul with complete replacement of Ø820 mm AGPZ-Kamysh-Burun main gas pipeline at 320-349 km.

2009

Complex overhaul of process pipelines using re-coating method at Rozhdestvenskaya Compressor Station of Stavropol Underground Gas Storage Facility.

Overhaul of input and output flow-lines of CS Egorlykskaya.

2008

Turn-key construction of gas distribution station in Krasnogvardejskoye village.

Overhaul with complete replacement of Ø1020 mm Ischerskaya-Mozdok main gas pipeline at 16-46 km.

2007

Overhaul with complete replacement of Ø720 Stavropol-Grozny main gas pipeline at 122-173 km.

2006

Corporate restructuring followed by establishment of Spetspromkonstruktsiya-Magistral LLC.

First contract for overhaul with complete replacement of ∅219 mm pipeline in Budennovsk.

Purchase of construction equipment fleet.

2004

Company applied new generation paint coatings on Gazprom process facilities.

Establishment of subsidiary InntekhInvest LLC.

2003

Establishment of Spetspromkonstruktsiya LLC.

Company applied new generation paint coatings on Gazprom process facilities.

Corporate social responsibility

SPK-Magistral seeks to integrate economic, environmental, social and management principles in its business. While conducting its operations in Russia and abroad, our company adheres to the principles of corporate social responsibility and intends to hold a transparent and respectful dialog with stakeholders giving consideration to their interests in long-term planning and daily decision making.

SPK-Magistral aims at conducting its business in a safe, responsible and efficient manner through: the use of Good International Industry Practice for design and construction of facilities, for any potential risk evaluation and mitigation, in the field of occupational safety, in the field of corporate social responsibility and environmental protection.
Corporate social responsibility

International HSE standards

SPK-Magistral maintains Integrated Management System (IMS) which includes HSE MS according to ISO 45001:2018 (OHSAS 18001) and EMS according to ISO 14001:2016. Company IMS complies with ISO 9001:2015 requirements.

SPK-Magistral undertakes to: evaluate and prevent environmental and production risks, negative environmental impact, take measures to minimize and prevent accident risks, personnel injuries and illnesses, comply with environmental and occupational health and safety laws and standards, ensure efficient and rational use of natural resources and energy.

And also to require suppliers and contractors to meet standards and rules of industrial safety, occupational safety and environmental protection, use of safe production technologies, to improve personnel commitment to and competence in environmental protection and safety, to ensure emergency preparedness and accident mitigation.
International HSE standards