Капитальный ремонт магистрального газопровода «АГПЗ-Камыш-Бурун» на участке 320-349 км.

Капитальный ремонт магистрального газопровода «АГПЗ-Камыш-Бурун» на участке 320-349 км.

Country:  Russia
Customer:  Gazprom Transgaz Stavropol, LLC
Length: 29 km. Diameter: Ø820 mm. Pressure: max. 5.4 MPa Work period: 2010 -2012 Client: Gazprom transgaz Stavropol, LLC/th> The works were conducted in semi-desert conditions with strong winds and dust storms. SPK-Magistral was constructing a 29 km long loop line, followed by dismantling of the old pipeline.

The challenge included a 4 km long section of watered ground. The section required a series of dewatering measures to lower the water table; a service driveway was built to enable the operations.

Multiple crossings over the Kuma River and an irrigation canal with stabilized banks were built.