Капитальный ремонт магистрального газопровода «Ищерская-Моздок» на участке 16-46 км.
Country: RussiaCustomer: Gazprom Transgaz Stavropol, LLC
Length: 16 km.
Diameter: Ø1020 mm.
Pressure: max. 5.4 MPa
Work period: 2008
Client: Gazprom transgaz Stavropol, LLC
While working on Ishcherskaya – Mozdok main gas pipeline overhaul project, section 16-46 km, SPK-Magistral completed 2 crossings over Tersko-Kumskiy canal and 5 motor road crossings.
An advanced combined crossing with Prokhladny – Mozdok motor and rail link was built using the directed drilling method.