Капитальный ремонт подземных технологических трубопроводов и подключающих шлейфов ДКС-2. Технологические трубопроводы 2 ступени.

Country:  Russia
Customer:  Gazprom Transgaz Stavropol, LLC
Scope of Work: The underground process piping and connecting flow-lines of BCS-2 were overhauled to align their technical condition with applicable standards and recover the facility's design characteristics in terms of safety and reliability without altering its key design parameters.

The works were complicated by the presence of high ground water at the 10th Gas-Pumping Unit. A series of dewatering actions were completed.

Due to the pattern of the existing underground gas pipelines, new design solutions were required, involving approvals by Neftegazgeodezia design institute.
The works were completed on schedule.