Строительство берегового участка морского газопровода «Турецкий поток» (Российский сектор), Россия
Country: RussiaCustomer: South Stream Transport B.V.
Scope of Work: SPK-Magistral has carried out welding procedure qualification in accordance with DNV-OS-F101-2010 (Offshore Standard for Submarine Pipeline Systems) prior to production time.
Total number of tests is 420, including bending, tension, Sharpie, strength and Crack Tip Opening Displacement tests (at -40 °С).
CRC-EVANS welding complex and mechanized welding technique were used for welding of the pipeline sections installed in areas with maximum slope of 7°. Manual welding technique was used for welding of bends. The time of continuous manual welding of one joint was 22 hours. The Graphova Gap ravine with 35° slope was crossed during construction.
Canusa equipment and materials were used for coating of welded joints. The expected useful life of the pipeline is 50 years.