Country:  Turkey
Customer:  South Stream Transport B.V.
Length: Two 2.3 km Lines
Diameter: 32 inches
Pipe wall thickness: 39 to 42 mm
Operating Pressure: 28.3 MPa

Scope of Work: geodesic survey, site preparation, trench excavation in rocky soil, civil works, welding and fit-up of the main pipeline, non-destructive testing, coating of welds, laying of pipeline, backfilling followed by layer-by-layer compaction, CP installation, hydrotesting, technical and biological reclamation.

A technical solution for assembly and installation of 20-ton Gooseneck in entry pits connecting the onshore and offshore pipeline sections was developed and implemented during project execution.