Расширение газотранспортной системы BULGARTRANSGAZ EAD Параллельно северному (магистральному) газопроводу до Болгарско-Сербской границы. Линейная часть. Участок A1. (км 66.1 – км 117.9)
Country: BulgariaCustomer: Bulgartransgaz EAD
Length: 51.8 km Diameter: DN1200 mm 48 inches Wall thickness: 14 mm to 25 mm Operating Pressure: 7.5 Scope of Work: Delivery of materials, geodesic survey, clearing and preparing the right-of-way, full range of linear part construction works (welding and mechanical, coating, earth works, erosion control measures), special works (installation of FOCL and CP system), intermediate hydrotesting, technical reclamation, taking part in final hydrotesting and start-up & commissioning. The project is challenging due to number of crossings with services (pipelines, communication cables, overhead lines), infrastructure facilities (regional and national highways), water courses (streams and rivers), and also due to geology and landscape (slopes and rocks).